Project Description
Client: City of Moreno Valley
Location: Moreno Valley, CA [Cactus Avenue from the I-215 to Heacock Street]
PROACTIVE was the Prime consultant, surveyor, and civil engineer, providing the Preliminary Engineering and final design for 1.6 miles of arterial widening and improvements on Cactus Avenue to accommodate a third lane from the I-215 to Heacock Street.
As the prime consultant, surveying responsibilities included aerial mapping, orthophotography, survey control, street cross sections, centerline stationing, project base mapping, right-of-way engineering, legal descriptions for takes and easements between the City and March Air Reserve Base, and overall engineering design support services. A Caltrans Encroachment Permit was acquired with mapping support to determine Caltrans limits.
Highlights:
- Lead team of 11 sub-consultants
- New traffic signals
- Signal modification
- Coordination with a major Caltrans interchange project (I-215/Cactus)
- Caltrans encroachment permit
- Coordination with March Air Reserve Base
- ROW acquisition