Project Description

Client: City of Moreno Valley
Location:  Moreno Valley, CA [Cactus Avenue from the I-215 to Heacock Street]

PROACTIVE was the Prime consultant, surveyor, and civil engineer, providing the Preliminary Engineering and final design for 1.6 miles of arterial widening and improvements on Cactus Avenue to accommodate a third lane from the I-215 to Heacock Street.

As the prime consultant, surveying responsibilities included aerial mapping, orthophotography, survey control, street cross sections, centerline stationing, project base mapping, right-of-way engineering, legal descriptions for takes and easements between the City and March Air Reserve Base, and overall engineering design support services. A Caltrans Encroachment Permit was acquired with mapping support to determine Caltrans limits.

Highlights:

  • Lead team of 11 sub-consultants
  • New traffic signals
  • Signal modification
  • Coordination with a major Caltrans interchange project (I-215/Cactus)
  • Caltrans encroachment permit
  • Coordination with March Air Reserve Base
  • ROW acquisition